The Pixar Phase II Project is a four-story, 155,000 square foot building on its’ 21-acre site. The new building will include artist work space for several departments, a small theater (approx. 110 seats), screening rooms, recording studio, game room, café (with kitchen), and computer equipment on four levels, including a partial basement and additional volleyball and basketball courts.
- Provided all reinforced concrete inspections.
- Provided inspections during Structural steel fabrication at Lee’s Imperial Welding in Fremont, California and field welding on site.
- Miscellaneous site work inspection which includes masonry, sidewalks, etc.
DURATION: 2008 – 2011
CONSTRUCTION COST: $64M