Â鶹Éç

HARBOR BRIDGE

The new bridge design incorporates a number of aesthetic features including a shared-use path, a community plaza, nighttime LED lighting, and xeriscape landscaping. In all, the Texas Department of Transportation (TxDOT) project includes design and construction of just over six miles of bridge and connecting roadway.

The project includes replacement of the existing Harbor Bridge and reconstruction of portions of US 181, I-37 and the Crosstown Expressway. The project will include the development, design, construction, and maintenance of a total of 6.44 miles of bridge and connecting roadway. The bridge will include six-lane sections of US 181, three lanes in each direction with a median barrier, shoulders, and a bicycle and pedestrian shared-use path. Additionally, the project includes the reconstruction of approximately 1.6 miles of I-37, reconstruction of approximately one mile of the Crosstown Expressway and demolition of the existing Harbor Bridge.

PaveTex Engineering, an Atlas Technical Consultants company, is the Construction Quality Acceptance Firm taking the lead on quality acceptance

Client

Texas Department of Transportation (TxDOT)

Location

Corpus Christi, Texas

Markets

Services