BART BERRYESSA EXTENSION 

BART Berryessa Extension adds 16 miles of heavy rail from the Warms Springs Station in South Fremont to the Berryessa Station in South San Jose. The project consisting of realigning utility and infrastructure elements, excavating and shoring underground sections of the trackway, building support structures for elevated track. The project also consists of two BART stations at Milpitas and Berryessa. Atlas provides Contractor Quality Control for the entire Design Build Team.

  • Full-service on-site testing laboratory for soils, concrete, shotcrete, aggregates.
  • Real-time electronic distribution of lab and field reports
  • On-site Atlas management.
  • Direct electronic links to the Design-Build Team providing expeditious information to the field.

DURATION: 2013- 2016
CONSTRUCTION COST: $2.3 BIL

Client

OWNER: VALLEY TRANSIT AUTHORITY/ BART CLIENT: SKANSKA/SHIMMICK/HERZOG JOINT VENTURE

Location

Fremont to San Jose, California

Markets

Services